RICE HUSK ASH ON CEMENT CONCRETE



  
       RICE HUSK ASH (RHA) PROPERTIES:

v    SPECIFIC GRAVITY:

WEIGHT OF EMPTY PYCNOMETER (M1)                                 : 324.5g
WEIGHT OF PYCNOMETER + RICE HUSK ASH (M2)             : 355.9g
WEIGHT OF PYCNOMETER + RHA + WATER (M3)                : 856.3g
WEIGHT OF PYCNOMETER +WATER (M4)                              : 871.7g

SPECIFIC GRAVITY OF RHA : M2-M1 / (M2-M1)-(M4-M3)
                                                   = 1.96        

SPECIFIC GRAVITY OF RHA = 1.96


v    BULK DENSITY :


EMPTY WEIGHT OF CALIBRATED CONTAINER           : 47g
WEIGHT OF CONTAINER + RHA                                                 : 96.6g
VOLUME OF CONTAINER                                                 :100 cm3

BULK DENSITY OF RHA     = (96.6-47) / 100
                                                = .496 g/cm3
                                                = 496 kg/m3

BULK DENSITY OF RHA : .496 g/cm3 i.e 496 kg/m3



v    FINENESS OF RHA:

MASS OF SAMPLE OF RHA                      : 100g
MASS PASSING 90 MICRON SIEVE        : 40g

FINENESS OF RHA  = 60%

High value due to ineffective grinding of sample.



EFFECT ON CEMENT AND CONCRETE:

v    WORKABILITY:

Ø SLUMP TEST

0-25mm SLUMP                                     LOW WORKABILITY
25-75mm SLUMP                                   MEDUIM WORKABILITY
75-100mm SLUMP                                 HIGH WORKABILITY


·        FOR 43 GRADE SANKAR OPC,0% RHA :

WATER CONTENT %
SLUMP (mm)
0.45
0
0.55
42
0.60
95

HIGH WORKABLILITY AT 0.60 WATER CONTENT

·        FOR SAME WATER CONTENT,AT DIFFERENT REPLACEMENT %

% REPLACEMENT
WATER CONTENT %
SLUMP (mm)
0
0.50
13
10
0.50
5
20
0.50
3
30
0.50
0
40
0.50
0


WORABILITY OF THE MIX REDUCES GREATLY AS THE PERCENTAGE REPLACEMENT OF RHA INCREASES.

·        VARYING WATER CONTENT ACCORDING TO STUDY PROVIDED ON LITERATURE

% REPLACEMENT
WATER CONTENT
SLUMP (mm)
0
0.50
13
10
0.54
10
20
0.55
7
30
0.56
0
40
0.57
0

VARYING THE WATER CONTENT SLIGHTY ACCORDING TO DATA GIVEN IN STUDY DOES NOT GIVE WORKABLE MIX.


·       TO FIND HIGH WORKABILITY WATER CONTENT FOT DIFFERENT PERCENTAGE (%) REPLACEMENTS.

§  10 % REPLACEMENT

WATER CONTENT
SLUMP (mm)
0.54
10
0.50
25
0.65
40
0.70
100

0.70 WATER CONTENT REQURED FOR HIGH WORKABLE MIX.

§  20 % REPLACEMENT

WATER CONTENT
SLUMP (mm)
0.55
7
0.60
13
0.65
25
0.70
42
0.75
60
0.80
86

0.80 WATER CONTENT REQUIRED FOR HIGH WORABLE MIX.


§  30 % REPLACEMENT


WATER CONTENT
SLUMP
0.56
0
0.60
6
0.65
14
0.70
21
0.75
40
0.80
59
0.85
82

0.85 WATER CONTENT REQUIRED FOR HIGH WORKABILITY MIX.

§  35 % REPLACEMENT

ACCORDING TO STUDY PROVIDED IN DATA MAXIMUM STRENGTH IS ACHIEVED AT 35 % REPLACEMENT OF RHA.

WATER CONTENT
SLUMP (mm)
0.60
5
0.65
13
0.70
17
0.75
30
0.80
55
0.90
80

0.90 WATER CONTENT IS REQUIRED TO GET A HIGH WORAKABLE MIX THAT PROVIDES MAXIMUM STRENGTH.

A HIGHLY WORABLE MIX AT 40% REPLACEMENT TEST NOT CARRIED OUT AS IT WOULD NOT BE TO GET DUE TO HIGH WATER CONTENT OF PRECEDING REPLACEMENTS.
v    NORMAL CONSISTENCY.


§  FOR 43 GRADE OPC .

WATER CONTENT
INITIAL READING
FINAL READING
HT. NOT PENETRATED.(mm)
0.30
0
9
9
0.31
0
6
6

NORMAL CONSISTENCY OF 43 GRADE OPC CEMENT=31%

§  10% REPLACEMENT

WATER CONTENT
INITIAL READING
FINAL READING
HT.NOT PENETRATED (mm)
0.31
0
40
40
0.40
0
25
25
0.45
0
0
0
0.42
0
11
11
0.43
0
5
5

NORMAL CONSISTENCY OF 90% OPC, 10% RHA = 43%

§  20 % REPLACEMENT

WATER CONTENT
INITIAL READING
FINAL READING
HT. NOT PENETRATED (mm)
0.43
0
38
38
0.45
0
37
37
0.47
0
35
35
0.49
0
28
28
0.52
0
22
22
0.54
0
18
18
0.55
0
15
15
0.56
0
12
12
0.57
0
10
10
0.58
0
9
9
0.59
0
7
7

NORMAL CONSISTENCY OF 80%OPC, 20%RHA  = 59%

§  30 % REPLACEMENT.


WATER CONTENT
INITIAL READING
FINAL READING
HT. NOT PENETRATED (mm)
0.57
0
38
38
0.59
0
35
35
0.61
0
33
33
0.65
0
25
25
0.67
0
20
20
0.69
0
18
18
0.71
0
16
16
0.73
0
13
13
0.75
0
11
11
0.77
0
8
8
0.79
0
6
6

NORMAL CONSISTENCY OF 70% OPC, 30 % RHA = 79%

v      INITIAL & FINAL SETTING TIME

§  FOR 43 GRADE OPC.

TIME (MINS)
DEPTH NOT PENETRATED (mm)
5
0
10
0
15
0
20
0
25
0.5
30
0.5
35
0.5
40
0.5
45
1
50
1
55
1
60
1
65
2
70
5

INITIAL SETTING TIME              : 70 MINS
FINAL SETTING TIME                 : 135 MINS

§  10 % REPLACEMENT.


TIME (MINS)
DEPTH NOT PENETRATED (mm)
5
0
10
0
20
0
30
0
40
.5
50
1
60
1
80
2
100
3.5
110
4
120
5

INITIAL SETTING TIME : 120 MINS
FINAL SETTING TIME   : 300 MINS

§  20 % REPLACEMENT.

TIME (MINS)
DEPTH NOT PENETRATED (mm)
10
0
20
0
30
0
40
0
50
0
60
.5
80
.5
100
1
120
2.5
140
3
160
4
170
4.5
180
5

INITIAL SETTING TIME : 180 MINS
FINAL SETTING TIME    : 480 MINS

§  30 % REPLACEMENT

TIME (MINS)
DEPTH NOT PENETRATED (mm)
10
0
20
0
30
0
40
0
60
0
80
.5
100
1
120
1
140
1.5
160
2
180
3
200
3
220
3.5
230
4
240
4.5
250
5

INITIAL SETTING TIME : 250 MINS
FINAL SETTING TIME    : >8 HOURS

No comments:

Post a Comment

leave your opinion